POWER BOILER
30TPH, 25BARG, 350°C DOUBLE DRUM, DUMP GRATE, BAGASSE FIRED BOILER ISLAND FOR CHASHMA SUGAR MILLS UNIT-II
Sugar Plant
Dera Ismail Khan, KPK, Pakistan
Chashma Sugar Mills Unit-II
- Steam generation at 10tph, 10barg pressure
- Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system.
- Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam distribution system.
30TPH, 45BARG, 450°C DOUBLE DRUM, DUMP GRATE, BAGASSE FIRED BOILER ISLAND FOR HUNZA SUGAR MILLS UNIT-I
Sugar Plant
Chak Jhumra, Punjab, Pakistan
Hunza Sugar Mills Unit-I
- Steam generation at 10tph, 10barg pressure
- Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system
- Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam distribution system.
30TPH, 35BARG, 350°C DOUBLE DRUM, CHAIN GRATE, BAGASSE & COAL FIRED BOILER ISLAND FOR SARENA TEXTILE MILLS
Textile Plant
Sheikupura Road, Punjab, Pakistan
Sarena Textile Mills
- Steam generation at 10tph, 10barg pressure
- Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system
- Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam distribution system.
THERMAL POWER PLANT
Faisalabad
Ihsan Textile Ltd.
- Multi solid flue fired power generation system
- 6 MW capacity
- Foundation & Civil Works for Main Boiler
- Foundation of Bagasse Carrier, Chimney, Turbo Generator, Oil Heaters.
- Civil Works of Raw water storage tank
- Civil Works of Smoke Cleaning Tunnel
- Control Room and office block Building
- Foundations and Building for Steam Turbine
- Concrete Pavements and Floorings
WASTE HEAT RECOVERY
KPK
Cherat Cement Factory
- Kiln flue gasses
- 7 MW capacity
- Civil Foundations
- Installation of Steel Structure
- Control Room Ancillary Works
- Installation of Waste Heat Recovery Boilers
- Installation of Turbo Generator Sets
- Installation of Pipe Lines, Valves & Accessories
- Construction of Walkways, Stairs, Gangways etc.