PRE-ENGINEERED BUILDINGS
STEEL SHUTTERING AND CONSTRUCTION OF MAST MONUMENT FOR AZADI CHOWK FLYOVER, LAHORE.
Government Sector
- Construction of steel shuttering of size and Mask MONIMENT SPECIFICATIONS for Azadi Chowk Flyover Lahore.
- Designed under AISC, UBC, AWS, AISI, ASCE and Building Code Pakistan with wind speed of 150km/hr. and seismic zone of 2A with importance factor 1.15.
![Azadi-Chowk-Flyover01](https://fabconengg.com/wp-content/uploads/2024/02/Azadi-Chowk-Flyover01.jpg)
![Azadi-Chowk-Flyover02](https://fabconengg.com/wp-content/uploads/2024/02/Azadi-Chowk-Flyover02.jpg)
![Azadi-Chowk-Flyover03](https://fabconengg.com/wp-content/uploads/2024/02/Azadi-Chowk-Flyover03.jpg)
![Azadi-Chowk-Flyover04](https://fabconengg.com/wp-content/uploads/2024/02/Azadi-Chowk-Flyover04.jpg)
![Azadi-Chowk-Flyover05](https://fabconengg.com/wp-content/uploads/2024/02/Azadi-Chowk-Flyover05.jpg)
BUS STATIONS AND PEDESTRIAN BRIDGES FOR ISLAMABAD METRO BUSRAPID TRANSIT SYSTEM, ISLAMABAD
Government Sector
- Construction of bus stations of 128.7m length and height 8.5m
- Pedestrian bridge 105m length and 8.5m height.
- Designed under AISC, UBC, AWS, AISI, ASCE and Building Code Pakistan with wind speed of 150km/hr and seismic zone of 2A with importance factor 1.15.
![Metro-Bus-Station01](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station01.jpg)
![Metro-Bus-Station02](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station02.jpg)
![Metro-Bus-Station03](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station03.jpg)
![Metro-Bus-Station04](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station04.jpg)
![Metro-Bus-Station05](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station05.jpg)
BUS STATIONS AND PEDESTRIAN BRIDGES FOR MULTAN METRO BUS RAPID TRANSIT SYSTEM, MULTAN
Government Sector
- Construction of bus stations of 72.2m length and height 7.5m
- Pedestrian bridge 105m length and 8.5m height.
- Designed under AISC, UBC, AWS, AISI, ASCE and Building Code Pakistan with wind speed of 150km/hr and seismic zone of 2A with importance factor 1.15.
![Multan-Metro01](https://fabconengg.com/wp-content/uploads/2024/02/Multan-Metro01.jpg)
![Multan-Metro02](https://fabconengg.com/wp-content/uploads/2024/02/Multan-Metro02.jpg)
![Multan-Metro05](https://fabconengg.com/wp-content/uploads/2024/02/Multan-Metro05.jpg)
![Multan-Metro04](https://fabconengg.com/wp-content/uploads/2024/02/Multan-Metro04.jpg)
![Multan-Metro03](https://fabconengg.com/wp-content/uploads/2024/02/Multan-Metro03.jpg)
BUS STATIONS AND PEDESTRIAN BRIDGES FOR LAHORE METRO BUS RAPID TRANSIT SYSTEM, LAHORE
Government Sector
- Construction of bus stations of 81m length and height 4.5m
- Pedestrian bridge 105m length and 8.5m height.
- Designed under AISC, UBC, AWS, AISI, ASCE and Building Code Pakistan with wind speed of 150km/hr and seismic zone of 2A with importance factor 1.15.
![Metro-Bus-Station-and-Pedestrian-Bridge01](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station-and-Pedestrian-Bridge01.jpg)
![Metro-Bus-Station-and-Pedestrian-Bridge02](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station-and-Pedestrian-Bridge02.jpg)
![Metro-Bus-Station-and-Pedestrian-Bridge03](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station-and-Pedestrian-Bridge03.jpg)
![Metro-Bus-Station-and-Pedestrian-Bridge04](https://fabconengg.com/wp-content/uploads/2024/02/Metro-Bus-Station-and-Pedestrian-Bridge04.jpg)
GLASS DOME, LAHORE
Government Sector
- 52 ft diameter steel glass dome
- RCC Hoop Beam Ring 1150 CUFT
- Electro Mechanical Works
- Installation of Glass Dome
![Glass-Dome04](https://fabconengg.com/wp-content/uploads/2024/02/Glass-Dome04.jpg)
![Glass-Dome05](https://fabconengg.com/wp-content/uploads/2024/02/Glass-Dome05.jpg)
PYRAMID DOME, MULTAN
Government Sector
- 72ft diameter poly carbonate glazed pyramid dome
- Construction of column foundations and beams
- Installation of steel structure
- Application of long-life poly-carbonate painting
- Installation of Poly-carbonate glazing
- Installation of louvers type ventilators
![Pyramid-Dome-Multan](https://fabconengg.com/wp-content/uploads/2024/02/Pyramid-Dome-Multan.jpg)
BRIDGE RAILING , LAHORE
Government Sector
- 120 ft. & 90 ft. Span, Overhead Steel Bridge
- RCC Foundations
- Concrete Pavements
- Grouting of Columns
- Installation of Steel Structure
- Application of Long-Life Polyurethane painting
- Installation of Polycarbonate glazing
![Bridge-Railing-Lahore](https://fabconengg.com/wp-content/uploads/2024/02/Bridge-Railing-Lahore.jpg)
PEDESTRIAN STEEL BRIDGE , LAHORE
Government Sector
- 120ft & 90ft Span, Overhead Steel Bridge
- RCC Foundations
- Concrete Pavements
- Grouting of Columns
- Installation of Steel Structure
- Application of Long-Life Polyurethane painting
- Installation of Polycarbonate glazing
![Pedestrian-Steel-Bridge-Lahore](https://fabconengg.com/wp-content/uploads/2024/02/Pedestrian-Steel-Bridge-Lahore.jpg)
ROAD RAILING
Government Sector
- 30km, Lahore Kasur Road
- Design of Steel Galvanized Pipe
- Railing 30 km long
- Fabrication and installation of Railing
- Concrete Foundations
![Road-Railing](https://fabconengg.com/wp-content/uploads/2024/02/Road-Railing.jpg)