POWER PLANTS

30TPH, 25BARG, 350°C DOUBLE DRUM, DUMP GRATE, BAGASSE FIRED BOILER ISLAND FOR CHASHMA SUGAR MILLS UNIT-II


Sector


Sugar Plant


Dera Ismail Khan, KPK, Pakistan


Chashma Sugar Mills Unit-II


  • Steam generation at 10tph, 10barg pressure
  • Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system.
  • Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam  distribution system.

Power-Boiler-Chashma-Sugar-Mill01
Power-Boiler-Chashma-Sugar-Mill02
Power-Boiler-Chashma-Sugar-Mill03
Power-Boiler-Chashma-Sugar-Mill04
Power-Boiler-Chashma-Sugar-Mill05

30TPH, 45BARG, 450°C DOUBLE DRUM, DUMP GRATE, BAGASSE FIRED BOILER ISLAND FOR HUNZA SUGAR MILLS UNIT-I


Sector


Sugar Plant


Chak Jhumra, Punjab, Pakistan


Hunza Sugar Mills Unit-I


  • Steam generation at 10tph, 10barg pressure
  • Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system
  • Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam  distribution system.

Power-Boiler-Hunza-Sugar-Mill01
Power-Boiler-Hunza-Sugar-Mill03
Power-Boiler-Hunza-Sugar-Mill02
Power-Boiler-Hunza-Sugar-Mill04

30TPH, 35BARG, 350°C DOUBLE DRUM, CHAIN GRATE, BAGASSE & COAL FIRED BOILER ISLAND FOR SARENA TEXTILE MILLS


Sector


Textile Plant


Sheikupura Road, Punjab, Pakistan


Sarena Textile Mills


  • Steam generation at 10tph, 10barg pressure
  • Saturated steam with package type, double drums, chain grate, natural circulation, balanced draft system
  • Boiler auxiliaries include de-aerator, feed water pumps, economizer, air heater, draft fans, blow down system and steam  distribution system.

Sareena-3-7-scaled
Sareena-4-4-scaled
Sareena-7-6-scaled
Power-Boiler-Hunza-Sugar-Mi

THERMAL POWER PLANT


Location


Faisalabad



Client


Ihsan Textile Ltd.


  • Multi solid flue fired power generation system
  • 6 MW capacity
  • Foundation & Civil Works for Main Boiler
  • Foundation of Bagasse Carrier, Chimney, Turbo Generator, Oil Heaters.
  • Civil Works of Raw water storage tank
  • Civil Works of Smoke Cleaning Tunnel
  • Control Room and office block Building
  • Foundations and Building for Steam Turbine
  • Concrete Pavements and Floorings

WASTE HEAT RECOVERY


Location


KPK



Client


Cherat Cement Factory


  • Kiln flue gasses
  • 7 MW capacity
  • Civil Foundations
  • Installation of Steel Structure
  • Control Room Ancillary Works
  • Installation of Waste Heat Recovery Boilers
  • Installation of Turbo Generator Sets
  • Installation of Pipe Lines, Valves & Accessories
  • Construction of Walkways, Stairs, Gangways etc.